Flush Deck Lid for Underguide Systems
Coverstar riser panel 309 cut to fit coping transition profiles 40inch long notch on both ends | M9354
Flush deck lids are installed before the deck is poured. When the deck is finished the lid should be flush with the deck. (Only available in gray) You will also need to order a descender kit with this lid to allow the lid to match the coping and provide a nice finished look.