CHEMTROL® Flow Cell Assembly (Option FCA)
Even though sensors may be mounted directly on the main recirculation line (2" only), it is recommended to install them in a Flow Cell Assembly (FCA) or in a Sensor Cell Cabinet (Wetbox), or even on a simple Bypass line (BPL). In addition to easier installation and maintenance, this provides better protection and security as well as ensures a smooth flow of water around the sensors
- Easy installation on bypass line,
- pH and ORP sensor fittings,
- Fitting for conductivity sensor,
- Clear viewing port,
- Two (2) flow control valves and sampling spigot,
- Anti-air block line,
- For new installations or upgrades.
Flow Cell Dimensioning