Some local codes require that public pools, pools that are in a condominium and apartment or other commercial application be ASME certified. ASME stands for American Society of Mechanical Engineers. They are a non-profit group which sets many industrial and manufacturing standards. A pool heater that is made to ASME standards will perform to a set of specifications as determined by ASME, specifically in relation to the operating water pressure the appliance can handle. Each and every ASME heat exchanger that goes into a Raypak heater is certified by a state inspector to make sure it complies with the ASME code for that particular product.
Cast Iron Glass-lined Header Raypak applies its years of commercial boiler experience to the design of its cast iron glass-lined headers. A metal header design allows for the higher working pressures required by ASME. All ASME headers are inspected upon arrival at Raypak and each lot (pour date) tested by an independent laboratory. Only after the material passes stress analysis and metal composition tests is it approved for use in an ASME unit.
Cupro-Nickel Fin Tube
Raypak Digital heaters can be ordered with cupro-nickel fin tube heat exchangers for added protection against aggressive water chemistry. Although rare, there are certain applications, like health club spa's, where copper is just not the best choice. Cupro-nickel offers superior tolerance to bad and fluctuating water chemistry, thanks to a harder surface and thicker walled fin tube.
Condensation Protection Standard on all RP2100 models is Raypak's Unitherm Governor, which is like an automatic bypass. The Unitherm Governor automatically regulates the water flow to help keep the water temperature in the heat exchanger above 105F.
Hi Flow Rates No need to worry about large pumps or high flow systems. The RP2100 comes with an automatic bypass built into the header. The RP2100 can handle up to 125 GPM.
Quality
ISO 9001 Raypak is proud to be a ISO 9001 registered manufacturing plant. One more reason why Raypak is number onein the heater industry today.
End-of-Line Test Every Raypak gas pool heater is plumbed and test fired before it is put in the carton. This ensures that your heater will fire right out of the box and continue to give you years of trouble-free operation.
Quality Checkpoints The Raypak assembly process includes 6 final assembly quality checkpoints that help to ensure that each and every Raypak RP2100 is built correctly, and built to last